Conservation Area Window Replacement Edinburgh

All 49 Conservation Areas · Prior Approval Handled · From Quoted per property

Edinburgh has 49 conservation areas covering more than a quarter of the city — including New Town, Old Town, Marchmont, Morningside, Bruntsfield, Stockbridge, The Grange, Inverleith, Trinity, Newington and Polwarth. Since May 2024, the City of Edinburgh Council requires prior approval for most window replacement on principal elevations and on road-facing side elevations of conservation-area properties. Heatscape handles the prior-approval paperwork as part of every quote.

What changed in May 2024

Before May 2024, permitted development rights allowed many conservation-area property owners to replace windows on certain elevations without council involvement. The Town and Country Planning (General Permitted Development) (Scotland) Amendment Order 2024 narrowed those rights significantly. Now most window replacement on principal elevations of conservation-area properties needs prior approval — a lightweight planning process where the council confirms the replacement meets conservation standards before work starts. Decision in 28 days; £252 application fee.

The principal elevation rule

The 'principal elevation' is the front of the building as seen from the street. Most Edinburgh conservation properties have a principal elevation facing the street and a rear elevation facing the back court or garden. Since May 2024, any window replacement on the principal elevation needs prior approval. Road-facing side elevations (typically at corner tenements and end terraces) also need prior approval in most conservation areas. Rear elevations and internal courtyard elevations generally don't, unless the property is also listed.

What the council will approve

On conservation-area principal elevations: timber sash and case windows matching the original profile, astragal pattern and glazing bar pattern; slim-line double glazing in original sashes; like-for-like timber casement replacement where the original was casement; reversible sash windows on upper-floor tenements (because they retain sash appearance). What they'll refuse: uPVC on principal elevations, modern tilt-and-turn appearance on traditional tenements, casement on properties originally built with sash and case, profile or astragal pattern that doesn't match the original.

The prior-approval application

We complete the prior-approval application as part of every conservation-area quote. Bundle includes: site plan, elevation drawings showing existing and proposed windows, manufacturer's specification for the replacement window, photograph of the existing window from the street, heritage statement (one page). Submitted electronically. Decision in 28 days. Application fee £252; consent fee included in our project price.

Edinburgh's main conservation areas

The 49 conservation areas range from the World Heritage Old and New Towns (the most strictly enforced) through inner-suburban tenement belts (Marchmont, Bruntsfield, Tollcross, Newington, Polwarth) to villa enclaves (Morningside, Merchiston, The Grange, Trinity, Inverleith) and outer-suburb conservation enclaves (Cramond, Colinton, Duddingston). Enforcement is tighter in the World Heritage areas — the council will reject anything that doesn't match the original exactly. Outer conservation areas tend to be more flexible on rear-elevation work.

How we work conservation projects

Survey, advise on what the council will approve, complete the prior-approval paperwork, submit to council, manufacture the windows during the 28-day decision window, install on approval. Total lead time 8–12 weeks from contract signing. Fixed price including all paperwork fees, no extras for council interventions. 10-year workmanship guarantee.

Frequently asked questions

Is my Edinburgh property in a conservation area?
Edinburgh has 49 conservation areas. The council's online conservation-area map shows boundaries — search the address on edinburgh.gov.uk. As a rule of thumb, almost all inner-belt tenements, all Georgian New Town, all Old Town, and most pre-1939 inner suburbs are within a conservation area.
What's the difference between prior approval and full planning permission?
Prior approval is a lightweight process (28-day decision, £252 fee) where the council confirms the replacement meets conservation standards. Full planning permission (12-week decision, £600+ fee) is required only for substantial changes — extensions, new openings, or any work the council bumps up from prior approval.
Can I put uPVC windows in a conservation area?
Not on the principal elevation or any road-facing side elevation — the council will refuse. Sometimes approved on rear elevations not visible from the street. We check your property and elevation before quoting.
What if my windows have already been replaced with uPVC?
On a listed building, the council can require reinstatement to timber. On a non-listed conservation property, existing uPVC is usually tolerated but a replacement will need to be timber. Selling a property with non-compliant uPVC windows can affect mortgageability.
How long does prior approval take in Edinburgh?
28 days from submission. We submit during the manufacture window so the consent and the window manufacture finish at the same time, minimising total project lead time.
Do you handle the prior-approval paperwork?
Yes — included in our project price. The application fee (£252) is also included; no separate charge to you.

Related Edinburgh window pages

Sash and case specialists

What our customers say